How Dateline Resources Is Fast-Tracking Gold and Rare Earth Drilling at Colosseum

Dateline Resources is intensifying its drilling campaign at the Colosseum Gold-REE Project in California, advancing its bankable feasibility study while exploring new gold and rare earth element targets. The company’s expanded rig fleet and geophysical surveys aim to unlock further value from this significant resource.

  • 27.1Mt at 1.26g/t Au for 1.1Moz gold resource with over 67% measured and indicated
  • Expanded drilling program supports bankable feasibility study and resource upgrade
  • New gold and rare earth element targets identified via magneto-telluric surveys
  • High-powered reverse circulation rigs mobilized to accelerate drilling pace
  • Planned induced polarization survey to refine exploration targeting
An image related to Dateline Resources Limited
Image source middle. ©

Drilling Momentum Builds at Colosseum

Dateline Resources Limited (ASX, DTR) is ramping up its exploration and development efforts at the Colosseum Gold-REE Project in California, a site boasting a substantial JORC-compliant gold resource of 27.1 million tonnes at 1.26 grams per tonne for 1.1 million ounces of gold. With over two-thirds of this resource classified as measured and indicated, the company is well positioned to advance towards production.

The current drilling campaign is multifaceted, focusing on infill and verification drilling to support the ongoing bankable feasibility study (BFS), which aims to refine the mineral resource and gather critical geotechnical data for mine design. This phase also includes confirmatory drilling on a historic stockpile to validate its grade for potential processing, ensuring no value is overlooked.

Exploring New Gold and Rare Earth Targets

Beyond resource upgrade drilling, Dateline is actively testing newly identified targets derived from magneto-telluric (MT) geophysical surveys. These surveys have highlighted several high-priority gold-bearing breccia pipe structures near existing deposits, which could extend the known mineralisation beyond the current 1.1 million ounces.

Simultaneously, the company is probing deep MT-derived anomalies prospective for rare earth elements (REE), notably the “2200N” resistivity feature. This target, extending from approximately 1,000 meters depth to near surface, is geologically analogous to the Mountain Pass REE mine located less than 10 kilometers away, suggesting promising potential for carbonatite-hosted REE mineralisation.

Accelerated Drilling Capacity and Survey Plans

To expedite this extensive drilling program, Dateline has engaged Major Drilling’s high-powered Schramm T-45WWS reverse circulation rigs, with one rig already operational and a second en route. These rigs complement Dateline’s own diamond drill rig, enabling simultaneous drilling for resource upgrades, geotechnical assessments, and exploration step-outs. This strategic deployment is designed to fast-track the BFS and shorten the timeline to first gold production.

Additionally, the company plans to conduct a targeted Induced Polarisation (IP) survey over select areas. This geophysical technique will help pinpoint near-surface sulphide-rich zones and structures potentially missed by broader MT surveys, refining drill targeting for both gold and REE mineralisation.

Outlook and Market Positioning

Dateline’s Managing Director, Stephen Baghdadi, emphasises the significance of this phase, "The ability to drill more metres faster will fast-track the Colosseum BFS and shorten the timeline to first gold production. We’re also eager to drill the newly identified gold and REE targets, which have the potential to add substantial value as we advance this project." The company’s recent economic update highlighted a robust project valuation with a net present value of US$550 million and an internal rate of return of 61%, underscoring the project’s financial attractiveness.

As assay results from the current drilling campaign are awaited, the market will be watching closely for confirmation of resource expansion and REE potential. With its strategic location near the Mountain Pass REE mine and a growing portfolio including the Argos Strontium Project, Dateline is positioning itself as a notable player in North American gold and critical minerals exploration.

Bottom Line?

Dateline’s accelerated drilling and exploration efforts at Colosseum could redefine its resource potential and hasten its path to production.

Questions in the middle?

  • Will assay results confirm extensions to the gold resource and validate new REE targets?
  • How will the planned induced polarization survey influence future drill targeting and resource estimates?
  • What impact will the expanded drilling capacity have on the timeline and cost of the bankable feasibility study?